User's Manual

Table Of Contents
48 of 50
List of Diagrams
936.5467 0.92
10 List of Diagrams
Fig. 1: Scope of delivery 16
Fig. 2: Example of a handover point for the BTS signals at a c-rail 18
Fig. 3: Example of a handover point for the BTS signals with individual loads with short
patch cables at a c-rail 18
Fig. 4: Clearance above radiation fins of the installed devices 19
Fig. 5: Sliding rails 19
Fig. 6: Power distribution bar mounted on the left-hand traverse 25
Fig. 7: Plugs for power connection: is for red circuit, for black circuit 25
Fig. 8: Attaching a 19" mounting bracket 26
Fig. 9: Attached sliding rails Ⓑ 26
Fig. 10: Place C-hub in rack 26
Fig. 11: Fix C-hub with screws 27
Fig. 12: Connect power cable at rear side 27
Fig. 13: Connect ground cable at rear side 27
Fig. 14: Attaching a 19" mounting bracket 28
Fig. 15: Marking position of mounting holes 28
Fig. 16: Mounting completed 28
Fig. 17: Connect power cable at rear side 29
Fig. 18: Connect ground cable at rear side 29
Fig. 19: Attaching handle 30
Fig. 20: Attaching bracket Ⓐ 30
Fig. 21: Marking mounting holes for bracket 31
Fig. 22: Prepare expansion bolts for bracket 31
Fig. 23: Mounting accessories for bracket 31
Fig. 24: Bracket mounted 31
Fig. 25: Hook HPRU into bracket () and fix from top (). 32
Fig. 26: HPRU fixed from top 32
Fig. 27: Fix HPRU from side 32
Fig. 28: Connect power cable at bottom side 33
Fig. 29: Connect ground cable at bottom side 33
Fig. 30: Interfaces at the C-hub front side 34
Fig. 31: Interfaces at the C-hub rear side 35
Fig. 32: Interfaces at the E-hub front side 36
Fig. 33: Interfaces at the E-hub rear side 37
Fig. 34: Interfaces at the HPRU connector side 38
Fig. 35: Fibre optical cable layout 40
Fig. 36: Coaxial cable layout 41
Fig. 37: Power supply cable layout 42