User's Manual

Table Of Contents
10 of 50
General Information
936.5467 0.92
2.2.3 Installation Location of Remote Units and Antennas
The installation location of remote units and antennas must satisfy the following requirements:
When installing remoteunits and antennas, the Installation Manual (K-BOW Platform2)
has to be considered.
Caution
Risk of injury due to non-ionising radiation radio frequency
When installing the antennas, pay attention to the required distance of at least 205cm
between antennas and human bodies during normal operation according to ETSIEN62311.
The safety clearance around remote units and antennas stated in the Installation Manual
(K-BOW Platform2) must be complied with.
It is recommended to meet a minimum distance of 1m between K-BOW antennas and
ISMequipment to avoid unwanted interference with WiFi or DECT or other equipment
running in the 2.4GHz ISMband.
The installation positions must be level.
1)
The static loading calculations must ensure that a K-BOW remote unit up to 15kg
in
weight can be installed and operated.
The safety clearance between adjoining systems must be complied with. See the
speci cations of the companies operating the adjoining systems.
Observe the permissible operational conditions of the remote units, especially the
ambient temperature. The permissible operational conditions depend on the type of the
remote unit and can be found in the data sheets of the remote units.
1)
If a remote unit is installed on an installation position that is not  at, the casing may be distorted
and thereby damaged when it is attached.
2.3 Installation and Operation
2.3.1 General
Observe the national standards, rules and regulations valid at the installation location
with regard to
the cable path from the power distribution to the system rack,
the  re safety,
the running of cables in escape routes.
For network cabling, use Ethernet Cat5 cables or better.
As an operator of K-BOW, ensure that the K-BOW system is only used according to its
intended use.
Only operate the K-BOW system if it is in perfect working order.
Check the safety installations regularly for proper operation and observe the national
standards, rules and regulations valid at the installation location.
Observe the standards stated in the document Safety Instructions (K-BOW Platform2),
for the installation, approval and operation of the K-BOW system.