User's Manual
Table Of Contents
- 1 About this Document
- 2 General Information
- 3 Preconditions and Requirements
- 4 Installing the C-Hub
- 5 Installing the E-Hub
- 6 Installing the HPRU
- 7 Cabling
- 8 System Documentation
- 9 Glossary
- 10 List of Diagrams
- 11 List of Tables
- Fig. 1: Scope of delivery
- Fig. 2: Example of a handover point for the BTS signals at a c-rail
- Fig. 3: Example of a handover point for the BTS signals with individual loads with short patch cables at a c-rail
- Fig. 4: Clearance Ⓐ above radiation fins of the installed devices
- Fig. 5: Sliding rails Ⓑ
- Fig. 6: Power distribution bar ① mounted on the left-hand traverse
- Fig. 7: Plugs for power connection: ① is for red circuit, ② for black circuit
- Fig. 8: Attaching a 19" mounting bracket
- Fig. 9: Attached sliding rails Ⓑ
- Fig. 10: Place C-hub in rack
- Fig. 11: Fix C-hub with screws
- Fig. 12: Connect power cable at rear side
- Fig. 13: Connect ground cable at rear side
- Fig. 14: Attaching a 19" mounting bracket
- Fig. 15: Marking position of mounting holes
- Fig. 16: Mounting completed
- Fig. 17: Connect power cable at rear side
- Fig. 18: Connect ground cable at rear side
- Fig. 19: Attaching handle
- Fig. 20: Attaching bracket Ⓐ
- Fig. 21: Marking mounting holes for bracket Ⓑ
- Fig. 22: Prepare expansion bolts for bracket Ⓑ
- Fig. 23: Mounting accessories for bracket Ⓑ
- Fig. 24: Bracket Ⓑ mounted
- Fig. 25: Hook HPRU into bracket Ⓑ (①) and fix from top (②).
- Fig. 26: HPRU fixed from top
- Fig. 27: Fix HPRU from side
- Fig. 28: Connect power cable at bottom side
- Fig. 29: Connect ground cable at bottom side
- Fig. 30: Interfaces at the C-hub front side
- Fig. 31: Interfaces at the C-hub rear side
- Fig. 32: Interfaces at the E-hub front side
- Fig. 33: Interfaces at the E-hub rear side
- Fig. 34: Interfaces at the HPRU connector side
- Fig. 35: Fibre optical cable layout
- Fig. 36: Coaxial cable layout
- Fig. 37: Power supply cable layout
- Tab. 1: Symbols and signal words
- Tab. 2: Storage of the system documentation
10 of 50
General Information
936.5467 0.92
2.2.3 Installation Location of Remote Units and Antennas
The installation location of remote units and antennas must satisfy the following requirements:
● When installing remoteunits and antennas, the Installation Manual (K-BOW Platform2)
has to be considered.
Caution
Risk of injury due to non-ionising radiation radio frequency
When installing the antennas, pay attention to the required distance of at least 205cm
between antennas and human bodies during normal operation according to ETSIEN62311.
● The safety clearance around remote units and antennas stated in the Installation Manual
(K-BOW Platform2) must be complied with.
● It is recommended to meet a minimum distance of 1m between K-BOW antennas and
ISMequipment to avoid unwanted interference with WiFi or DECT or other equipment
running in the 2.4GHz ISMband.
● The installation positions must be level.
1)
● The static loading calculations must ensure that a K-BOW remote unit up to 15kg
in
weight can be installed and operated.
● The safety clearance between adjoining systems must be complied with. See the
speci cations of the companies operating the adjoining systems.
● Observe the permissible operational conditions of the remote units, especially the
ambient temperature. The permissible operational conditions depend on the type of the
remote unit and can be found in the data sheets of the remote units.
1)
If a remote unit is installed on an installation position that is not at, the casing may be distorted
and thereby damaged when it is attached.
2.3 Installation and Operation
2.3.1 General
● Observe the national standards, rules and regulations valid at the installation location
with regard to
– the cable path from the power distribution to the system rack,
– the re safety,
– the running of cables in escape routes.
● For network cabling, use Ethernet Cat5 cables or better.
● As an operator of K-BOW, ensure that the K-BOW system is only used according to its
intended use.
● Only operate the K-BOW system if it is in perfect working order.
● Check the safety installations regularly for proper operation and observe the national
standards, rules and regulations valid at the installation location.
● Observe the standards stated in the document Safety Instructions (K-BOW Platform2),
for the installation, approval and operation of the K-BOW system.