User's Manual
Table Of Contents
- 1 About this Document
- 2 General Information
- 3 Preconditions and Requirements
- 4 Installing the C-Hub
- 5 Installing the E-Hub
- 6 Installing the HPRU
- 7 Cabling
- 8 System Documentation
- 9 Glossary
- 10 List of Diagrams
- 11 List of Tables
- Fig. 1: Scope of delivery
- Fig. 2: Example of a handover point for the BTS signals at a c-rail
- Fig. 3: Example of a handover point for the BTS signals with individual loads with short patch cables at a c-rail
- Fig. 4: Clearance Ⓐ above radiation fins of the installed devices
- Fig. 5: Sliding rails Ⓑ
- Fig. 6: Power distribution bar ① mounted on the left-hand traverse
- Fig. 7: Plugs for power connection: ① is for red circuit, ② for black circuit
- Fig. 8: Attaching a 19" mounting bracket
- Fig. 9: Attached sliding rails Ⓑ
- Fig. 10: Place C-hub in rack
- Fig. 11: Fix C-hub with screws
- Fig. 12: Connect power cable at rear side
- Fig. 13: Connect ground cable at rear side
- Fig. 14: Attaching a 19" mounting bracket
- Fig. 15: Marking position of mounting holes
- Fig. 16: Mounting completed
- Fig. 17: Connect power cable at rear side
- Fig. 18: Connect ground cable at rear side
- Fig. 19: Attaching handle
- Fig. 20: Attaching bracket Ⓐ
- Fig. 21: Marking mounting holes for bracket Ⓑ
- Fig. 22: Prepare expansion bolts for bracket Ⓑ
- Fig. 23: Mounting accessories for bracket Ⓑ
- Fig. 24: Bracket Ⓑ mounted
- Fig. 25: Hook HPRU into bracket Ⓑ (①) and fix from top (②).
- Fig. 26: HPRU fixed from top
- Fig. 27: Fix HPRU from side
- Fig. 28: Connect power cable at bottom side
- Fig. 29: Connect ground cable at bottom side
- Fig. 30: Interfaces at the C-hub front side
- Fig. 31: Interfaces at the C-hub rear side
- Fig. 32: Interfaces at the E-hub front side
- Fig. 33: Interfaces at the E-hub rear side
- Fig. 34: Interfaces at the HPRU connector side
- Fig. 35: Fibre optical cable layout
- Fig. 36: Coaxial cable layout
- Fig. 37: Power supply cable layout
- Tab. 1: Symbols and signal words
- Tab. 2: Storage of the system documentation
2 of 64
936.5468 0.92
Contents
1 About this Document 4
1.1 Version and Version History 4
1.2 Product and Manufacturer 4
1.3 Markings 4
1.4 Target Audience 5
1.5 Scope of the Document 5
1.6 Applicable Documents 5
1.7 Abbreviations 6
1.8 Disclaimer 6
2 General Information 7
2.1 General Safety Instructions 7
2.2 Safety Requirements for the Installation Locations 9
2.3 Electrical and Mechanical Safety 10
2.4 IC Warnings 11
2.5 FCC Warnings 11
2.6 Intended Use 13
2.7 K-BOW System Architecture 13
2.8 Qualification of the Personnel 13
2.9 Preconditions and Requirements 13
3 Powering up the System and Checking the Status LEDs 14
4 Accessing the Devices' Web Interface (Web GUI) 15
4.1 Requirements 15
4.2 Network Functionality 15
4.3 Accessing the Web GUI Using Ethernet via C-Hub 15
4.4 Accessing the Web GUI Using Ethernet via Slave Hubs/RUs 17
4.5 Accessing the Web GUI using WLAN 18
4.6 Structure of the Web GUI 18
5 Setting up the C-Hub 19
5.1 Check the Modules' Connection Status 19
5.2 Set the Device Identification 20
5.3 Set the SNMP and FTP Parameters 21
5.4 Update the K-BOW System Software 21
5.5 Configure the Band 23
5.6 Configure the Input Power 24
5.7 Configure the Band Gain 26
5.8 Configure the Alarm 27
6 Setting up the E-Hub 29
6.1 Query the Status of the E-Hubs 29
6.2 Configure the Alarms 29
7 Setting up the Remote Units 30
7.1 Query the Status of the Remote Units 30
7.2 Configure the Band Gain 30