Product Manual
9
OWNERS MANUAL
Post Mount Cabinet Installation
The post mount cabinet can be attached to a 4x4 post or to a vertical wall (shed) with electrical service.
(2) lag screws are provided to mount the post mount cabinet. Pre-drill (2) 3/16” holes vertically spaced 2 3/8”
apart. Install (1) lag screw into the wall or post, leaving the hex head out about ¼” using a standard 7/16” socket
wrench. Hang the cabinet from this screw using the bottom key-hole slot in the cabinet (a second person may
be needed to help hold the cabinet in place). Install the second lag screw in the top mounting hole. Tighten the
bottom lag screw.
Remote Manifold Accessory Installation
Robust-Aire systems that were ordered with the optional remote manifold accessory were factory built with a
single air line exiting each compressor. Follow the instructions below to assemble and install the remote
manifolds.
Materials required:
¾” Sch. 40 PVC Pipe (amount to be determined by user)
¾” Sch. 40 PVC Pipe Couplings (as needed)
PVC Primer and Glue
PVC Pipe Cutter
Shovel or other tools to dig a trench
Pliers (hose clamp installation)
Thread sealant