Installation Guide

INSTALLATION INSTRUCTIONS
Read these instructions thoroughly before you begin.
Always inspect sink closely for damage prior to installing. Do not install a damaged sink.
Take care when handling vitreous china sinks as they can be heavy.
Adhere to all local building and plumbing codes.
Use the sink as your template. Place sink upside down in the
position where sink is to be installed. Pay attention to the
backsplash, faucet placement and vanity cabinet constraints.
Trace around the sink.
Top Mount Vitreous China Sinks
For questions please call Karran USA customer service - 866.452.7726 - info@karran.com
Draw a second line 1/2” inside of the outside perimeter line.
This will be your cut line.
Drill a starter hole just inside of the cut line.
Use a jigsaw to make the cutout. If you are using a counter-
top material other than laminate, you will need to use the
appropriate router and hard surface template to accomplish
the cutout.
Place a bead of a good quality silicone on the underside
rim of the sink. Locate the sink correctly in the cutout in the
countertop. Place some weight (about 10lbs) in the bowl to
provide pressure while the silicone cures. Wipe up excess
silicone with a damp rag before it dries.
1 2
3 4
5 6
Silicone

Summary of content (1 pages)