Specification

Hot
1
2
3
4
5
6
13
2
3
4
5
6
Cold
INSTALLATION GUIDE
STEP 1
STEP 2
3
8
9
10
11
12
1. Position the o-ring and faucet
body in the installation surface
as shown and secure it with the
rubber washer
and tighten the nut with
adjustable wrench.
(#9)
(#8)
(#10) and clamp (#11)
(#12)
2.Position the o-ring (#2) and handle mounting (#1,#13) in
installation surface as shown and secure it with kit (#3,#4,#5,#6)
and tighten the screws with screwdriver. Repeat the above steps
for the other handle.