ASSEMBLY & INSTALLATION INSTRUCTIONS 4 MODEL: 6313 KA La 0 BRIER FIELD 3 LIGHT BATH ELECTRICAL / MOUNTING INSTALLATION STEP 1: Fasten (2) 8-32 x 1 studs into mounting plate so that they extend away from the ceiling when the mounting plate | is installed. HAZ xa" 80 JUNCTION BOX {NOT INCLUDED) STEP: Attach mounting plate to outlet box with the (2) 8-32 x BRT STUD (2 PG 3/4” screws. GROUT SUPPLY WIRE STEP 3: Refer to wiring diagram.