Tus neeg siv phau ntawv
42
Step 2: Connecting & swing arms
1. Slide 2 WAVE WASHERS (150) onto each side of the Swing Arm Axle. Slide the LOWER SWING
ARMS (10 LEFT, 11 RIGHT) onto the axles and secure with the 2 HEX HEAD BOLTS (99)
and FLAT WASHERS (141). Do not force the Swing Arms onto the axle. You may need to jiggle
them a little to get them lined up properly. The Swing Arms have been previously
installed at the factory - so they do fit properly.
2. Remove the tie that holds the spacer in the rod end located at the end of the RIGHT CONNECTING
ARM (9) and line up the rod end with the bracket at the bottom of the LOWER RIGHT SWING
ARM (11). Slide the HEX HEAD BOLT (101) through the bracket of the Lower Swing Arm
and then through the rod end and spacer. Install the FLAT WASHER (142) and NYLOC NUT
(192) on the bolt and tighten firmly. Repeat this step for the left side.
Needed Hardware for this step:
#101. 5/16" × 1- 1/4"
Hex Head Bolt (2 pcs)
#150. Ø 17 × 0.3T
Wavy Washer (4 pcs)
#141. 5/16" × 23 × 1.5T
Flat Washer (2 pcs)
#192. 5/16" × 9T
Nyloc Nut (2 pcs)
#142. 5/16" × 20 × 1.5T
Flat Washer (2 pcs)
#99. 5/16" × 15mm
Hex Head Bolt (2 pcs)