Instructions / Assembly

For Professional Technical Support call 1-844-242-2475 7
3. PUMP TO PRESSURE TANK AND TO HOUSE CONNECTION
NOTE: The pump must be within 4’ of the tank to prevent switch chatter. Check the tank recharge on a yearly
basis.
Pre-Charge Tank Connection
1. Most pressure tanks will have a 1in. inlet elbow on the
bottom. Connect to this elbow with a 1in. PVC MPT×S
Male Adapter and a short piece of 1in.PVC rigid Pipe.
(Fig. 1)
2. Cement a 1in.PVC 90-Degress S×S Elbow. (Fig. 2)
3. Cement a 1in.PVC rigid Pipe into elbow then cements
a 1in.×3/4in.PVC Reducing Male Adapter. (Fig. 3)
4. Cement a 3/4in.PVC rigid Pipe into a 3/4in. CPVC
CTC Socket Tee Fitting. Cement 3/4in. PVC MPT×S
Male Adapter into 3/4in.PVC rigid Pipe that connect
with a 3/4in. PVC FPT×FPT Union .(Fig. 4)
5. Make the connection to the house plumbing. From the
tee, install pipe and 3/4in.Slip×Slip Ball Valve
(optional). (Fig. 5)
6. Install a 1 in. male NPT x 1 in. female NPT x 1 in.
female NPT galvanized tee to the outlet of the pump.
(Fig. 6)