USING INSULATION:
Housings are designed for direct contact with insulating materials
which are approved for this application (Fig. 1).
USING GASKETS (only available for some models):
Housings are supplied with pre-installed gaskets for energy savings
and to comply with energy code air leakage requirements per ASTM
E283.
INSTALLATION OPTION 1: JOIST CEILING
Step 1: Extend bar hangers to t between joists. Bar hanger foot is
contoured to easily align with bottom of joist (Fig. 2). Position xture by
hammering Real-Nails® into joists (Fig. 3).
Note: Bar hanger may be shortened to t 12” framing or smaller by
breaking at score lines.
Note: Nail can be removed with hammer claw to allow easy
repositioning of xture without damaging bar hanger or nail (Fig. 5).
Step 2. Slide xture along bar hangers into desired location. Use
locking screws or slot to secure (Fig. 4).
Step 3. Follow steps 1-4 under Electrical Connection.
Step 4. When installing in drywall, cut appropriate sized hole. After
installing drywall, if necessary, adjust xture for ceiling thickness
by loosening hex screws that attach the round housing to the plaster
frame. (Fig. 2)
INSTALLATION OPTION 2: SUSPENDED CEILING
Step 1. Locate center of proposed opening on ceiling tile and cut
appropriate sized hole.
Step 2. Place ceiling tile in T-bar grid.
Step 3. Place xture into position and snap bar hanger foot with in-
tegral T-bar clips onto T-bars (Fig. 6). Additional holes provided for
securing with wire or screws as needed (Fig. 7).
FIGURE 1
FIGURE 2
FIGURE 3
FIGURE 4
FIGURE 5