Instructions / Assembly

INSTALLATION INSTRUCTIONS
JUNO QUICK CONNECT NEW CONSTRUCTION LED HOUSINGS - QC SERIES
One Lithonia Way • Conyers, GA 30012 • Phone 1-800-705-7378
Visit us at www.acuitybrands.com/juno-recessed
© 2022 Acuity Brands Lighting, Inc.
P4921
Rev 01/22
Page 2
USING INSULATION:
Housings are designed for direct contact with insulating materials
which are approved for this application (Fig. 1).
USING GASKETS (only available for some models):
Housings are supplied with pre-installed gaskets for energy savings
and to comply with energy code air leakage requirements per ASTM
E283.
INSTALLATION OPTION 1: JOIST CEILING
Step 1: Extend bar hangers to t between joists. Bar hanger foot is
contoured to easily align with bottom of joist (Fig. 2). Position xture by
hammering Real-Nails® into joists (Fig. 3).
Note: Bar hanger may be shortened to t 12” framing or smaller by
breaking at score lines.
Note: Nail can be removed with hammer claw to allow easy
repositioning of xture without damaging bar hanger or nail (Fig. 5).
Step 2. Slide xture along bar hangers into desired location. Use
locking screws or slot to secure (Fig. 4).
Step 3. Follow steps 1-4 under Electrical Connection.
Step 4. When installing in drywall, cut appropriate sized hole. After
installing drywall, if necessary, adjust xture for ceiling thickness
by loosening hex screws that attach the round housing to the plaster
frame. (Fig. 2)
INSTALLATION OPTION 2: SUSPENDED CEILING
Step 1. Locate center of proposed opening on ceiling tile and cut
appropriate sized hole.
Step 2. Place ceiling tile in T-bar grid.
Step 3. Place xture into position and snap bar hanger foot with in-
tegral T-bar clips onto T-bars (Fig. 6). Additional holes provided for
securing with wire or screws as needed (Fig. 7).
FIGURE 1
FIGURE 2
FIGURE 3
FIGURE 4
FIGURE 5