Preparing the Site for M7i Router
Installation
M7i Router Site Preparation Checklist on page 37
M7i Router Rack Requirements on page 38
M7i Router Clearance Requirements for Airflow and Hardware Maintenance on page 40
M7i Router Site Preparation Checklist
The checklist in Table 9 on page 37 summarizes the tasks you need to perform when
preparing a site for router installation.
Table 9: Site Preparation Checklist
NotesDatePerformed ByItem or Task
Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances.
Measure distance between external power
sources and router installation site.
Select the type of rack.
Plan rack location, including required space
clearances.
Secure rack to floor and building structure.
Acquire cables and connectors.
Locate sites for connection of system
grounding.
Calculate power budget and power margin.
Related
Documentation
M7i Router Description on page 3