Datasheet

Figure 18: Airflow Through the Chassis
Related
Documentation
Maintaining the M7i Cooling System on page 77
M7i Router Clearance Requirements for Airflow and Hardware Maintenance on page 40
M7i Router Description on page 3
M7i Cable Management System
The cable management system consists of racks that attach vertically to each side of
the chassis at the front. Pass PIC cables through the slots in the racks to keep the cables
organized and securely in place, and to avoid bending optical cables beyond the proper
bend radius. The cable management system evenly distributes the weight of a cable, so
that it is not subjected to undue stress at the connector.
Related
Documentation
Installing the M7i Cable Management System on page 47
M7i Router Description on page 3
Overview of M7i Router Installation on page 41
27Copyright © 2012, Juniper Networks, Inc.
Chapter 2: M7i Hardware Components