Network Router User Manual

4. Remove the accessory box and packing material from the top of the router.
5. Open the accessory box and verify the contents against the parts inventory on
the label attached to the box.
6. Remove the router from the shipping carton.
7. Verify the chassis components received against the packing list included with
the router. A generic parts inventory appears in Table 15 on page 48.
8. Save the shipping carton, packing materials, and pallet in case you later need to
move or ship the router.
Figure 17: Unpacking the Router
Table 15: Generic Inventory of Router Components
QuantityComponent
Up to 2Fan tray
Up to 2CFEB
2HCM
2Mounting brackets
Up to 8PIC
Up to 4Power supply
48 Unpacking the Router
M10i Internet Router Hardware Guide