Services Routers Hardware Guide
Chapter 5
Installing and Connecting a Services
Router
Make the appropriate preparations and verify the J-series equipment before installing
a J-series Services Router and connecting it to a power source and the network.
CAUTION: Do not install a combination of modules in a single chassis that exceeds
the maximum power and heat capacity of the chassis. If J-series power management
is enabled, PIMs and modules (PIMs or PIMs plus a WXC Integrated Services Module)
that exceed the maximum power and heat capacity remain offline when the chassis
is powered on.
This chapter contains the following topics:
■ Before You Begin on page 77
■ Unpacking a J-series Services Router on page 78
■ Installing J2320 and J2350 Routers on page 79
■ Installing J4350 and J6350 Routers on page 80
■ Connecting Interface Cables to Services Routers on page 83
■ Chassis Grounding on page 83
■ Connecting Power on page 84
■ Powering a Services Router On and Off on page 89
Before You Begin
Before you begin installation, complete the following tasks:
■ Read the information in “Maintenance and Operational Safety Guidelines and
Warnings” on page 225, with particular attention to “Chassis Lifting
Guidelines” on page 216.
■ Determine where to install the Services Router, and verify that the rack or
installation site meets the requirements described in “Preparing for Router
Installation” on page 63.
■ For installation, gather the following equipment and tools:
Before You Begin ■ 77