Installation Guide
15
The double hole lug must satisfy the UL standard.
The diameter of the grounding cable must be AWG15 or greater.
The JRL-113BT48 has two grounding screws located on the bottom of the unit, as shown
in Figure 3-4. Follow the steps below the figure to connect the ground cable.
Figure 3-4 Grounding Screws
1. Unscrew one grounding screw, connect one end of the ground cable to the
grounding screw, and fasten it again.
2. Repeat step 1 for the second grounding screw.
3. Once the eNB is installed at the outdoor location, the other end of the ground cable
needs to connect to a good grounding point.
Power on to Check LED Status 3.6
Power on the eNB, and wait a few minutes while the eNB boots up. Per the previous
Table 1-2 in “1.3 Appearance”, check that the LED indicators are lighting as expected.