Operation Manual

STEP 1
1. Place rubber cap (42) into both ends of left base (3).
2. Insert guide rods (2) to left base (3).
3. Attach main base (1) to left base (3) fasten all bolts by using tool.
4. Attach verticle beam (10) to mainbese (1).
5