Additional Information

P
P r o d u c t D a t a S h e e t O c t o b e r 2 0 0 9
Page 6
Installation:
1- Re-balling JIG installation:
It contains three main parts:-
- Part (A), the top cover which contains the extra ball pockets at the
bottom and 4 screws to fasten the mask, in addition to slide channel
to collect the extra balls for re-use (figure 5).
- Part (B), it aligns the package level with the stencil level, and it is
used to be fastened to part (A).
- Part (C), it is called “The Base, includes the vertical adjusting screw
and the four stoppers which are holding the package IC. Stoppers are
used to fine tune the package IC pads together with the stencil holes.
Figure (5)