User's Manual
Doc No: WG6031-00-DTS-D02
Copyright © JORJIN TECHNOLOGIES INC. 2017
http://WWW.JORJIN.COM.TW
CONFIDENTIAL
Page 12
8. SMT AND BAKING RECOMMENDATION
8.1. Baking Recommendation
Baking condition:
- Follow MSL Level 4 to do baking process.
- After bag is opened, devices that will be subjected to reflow solder or other high
temperature process must be
a) Mounted within 72 hours of factory conditions <30°C/60% RH, or
b) Stored at <10% RH.
- Devices require bake, before mounting, if Humidity Indicator Card reads >10%
If baking is required, Devices may be baked for 8 hrs at 125 °C.
8.2. SMT Recommendation
Recommended Reflow profile:
H