Installation Guide

PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and
hardware contents list. If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 20 minutes.
1. Fix the mounting bracket(B) to the outlet box with machine screw(C).
2. Make wire connections, with wire connectors(D), following the reference chart listed below.
Connect, Hot, Black or Red Outlet Supply Wire to:
Connect, Neutral, White Outlet Supply Wire to:
Black
White
* Parallel Cord (round & smooth)
* Parallel Cord (square & ridged)
Clear, Brown, Gold or Black without Tracer (colored
stripes)
Clear, Brown, Gold or Black with Tracer (colored stripes)
Insulated Wire (not green) with copper metal conductor
Insulated Wire (not green) with Silver metal conductor.
*Note: When parallel wire ( SPT I & SPT II ) is used. The neutral wire is square shaped
and ridged and the hot wire will be round in shape and smooth. ( See Illustration on left. )
Grounding Instructions:
a) For installation in the United States: Wrap ground wire from outlet box around green
ground screw on mounting bracket, no less than 2" from wire end. Tighten ground screw. If
fixture is supplied with a ground wire, connect to outlet ground wire with a wire connector.
3. Orient the ceiling canopy(G) so that the mounting screws(A) protruding from the mounting bracket go into
4. Connect the tubes(H) together to get desired length and fix the bottom end to ring nut(I) on the top of glass,
the top end to the canopy.
5. Install bulb(J). Be sure to use light bulb(s) with wattage no greater than specified on this
PLEASE USE ON/OFF TYPE"A" BULB MAX 60-WATT OR CFL BULB MAX13 -WATT OR LED BULB MAX9 -WATT
THERE ARE LED 1PCS 4WATT BULB IN THE BOX
ENJOY YOUR LAMP
2/2