Installation Guide

1.Determinethelocationforthelamp.Usingthemountingplate(B)asatemplate,markthelocationof
theholesfortheplasticanchors(I).
2.Drilltheappropriatesizeholesfortheplasticanchors(I).(theholesshouldbeslightlysmallerthan
thesizeoftheplasticanchors(I).).Installtheplasticanchors(I)tothehole.Screwinthewoodscrew(J)
totheplasticanchors(I).
3.Fixthemountingplate(B)totheoutletboxwithmountingscrew(A).
4.Makewireconnections,withwireconnectors(E),followingthereferencechartlistedbelow.
*Note:Whenparallelwire(SPTI&SPTII)isused.Theneutralwireissquareshaped
andridgedandthehotwirewillberoundinshapeandsmooth.(SeeIllustrationonleft.)
GroundingInstructions:
a)ForinstallationintheUnitedStates:Wrapgroundwirefromoutletboxaroundgreen
groundscrew(D)onmountingplate,nolessthan2"fromwireend.Tightengroundscrew.If
fixtureissuppliedwithagroundwire,connecttooutletgroundwirewithawireconnector.
b)ForinstallationinCanada:Iffixtureissuppliedwithgroundwire,wrapgroundwire
aroundgreengroundingscrewonmountingbracket.Tightengroundscrew.
5.Orientthebody(F)sothatthemachinescrew(C)protrudingfromthemountingplate(B)gointo
theholesinthebody(F),thensecureitwiththescrewedball(G)
6.Installbulbs(H).Besuretouselightbulb(s)withwattagenogreaterthanspecifiedonthis
fixture.Alwaysmakesurethatelectricalcurrentisturnedoffbeforechangingbulbs.
ENJOY YOUR LAMP
Clear,Brown,GoldorBlackwithoutTracer(coloredstripes) Clear,Brown,GoldorBlackwithTracer(coloredstripes)
InsulatedWire(notgreen)withcoppermetalconductor InsulatedWire(notgreen)withSilvermetalconductor.
PLEASE USE ON/OFF TYPE"B" BULB MAX 40-WATT OR CFL BULB MAX 13-WATT OR LED BULB 9-WATT
THERE ARE 3PCS 4-WATT LED BULB IN THE BOX
Black White
*ParallelCord(round&smooth) *ParallelCord(square&ridged)
PREPARATION
Beforebeginningassemblyofproduct,makesureallpartsarepresent.Comparepartswithpackagecontentslistand
hardwarecontentslist.Ifanypartismissingordamaged,donotattempttoassembletheproduct.
EstimatedAssemblyTime:20minutes.
Connect,Hot,BlackorRedOutletSupplyWireto: Connect,Neutral,WhiteOutletSupplyWireto:
2/2