Actuator Install Instructions
Table Of Contents
VA9208-AGx-x Series On/Off and Floating Point Electric Spring Return Valve Actuators Installation
Instructions
7
6. Insert fixed pointer and M4x0.7x83 mm long screw
into the Side B actuator hub. Direct the arrow on
the pointer to 0% (Figure 14).
7. Install the actuator on the ball valve (Figure 15).
Tighten the actuator mounting screw to a torque of
10 to 12 lb·in. (1.1 to 1.4 N·m) and snap the large
adjustable pointer into place.
Mounting the Thermal Barrier
Figure 16 shows the optional M9000-561 Thermal
Barrier.
To mount the optional thermal barrier:
1. Install the thermal barrier drive shaft into the
thermal barrier by aligning the tab on the drive
shaft with the slot on the thermal barrier
(Figure 17).
2. Rotate the drive shaft to align marks on the top of
the thermal drive shaft with matching marks on the
valve stem.
Figure 14: Installing the Fixed Pointer
Figure 15: Mount the Actuator
Figure 16: Optional M9000-561 Thermal Barrier
Barrier
Drive
Shaft
Machine Screws
Flange
Nuts
Figure 17: Installing the Drive
Shaft into the Thermal Barrier