Installation Guide

3
IMPORTANT - Read Before Assembly
12 in. deep Premier Organizer and 16 in. deep Deluxe Organizer
use the same assembly instruction process EXCEPT DURING
THE J-HOOK PLACEMENT ON THE ANGLE BRACKET.
Assembly instructions are written for 8 ft. conguration A.
All assembly processes are the same for each conguration
EXCEPT for the order or locations of the assembly process.
Use selected conguration for shelf locations.
Shelf lengths and Garment bars may need to be cut depending upon conguration
desired.
All cut shelf lengths are used in closet congurations supplied. Depending upon
your closet dimensions, some cut lengths may not be usable.
EXAMPLE: If you choose an 8 ft. closet conguration and the width of your
closet is 8 ft. 4 in., the cut shelf length will be short 4 in. for use. It is recommended
that if your closet is over the selected dimension (8 ft.), then choose a congura-
tion from the next dimension higher (10 ft.).
EXAMPLE: If you choose an 8 ft. closet conguration and the width of your
closet is 7 ft. 6 in., some shelf lengths may need to be cut 6 in. shorter in length
to t closet dimensions.
VERIFY SHELF MEASUREMENTS
MEASURE - MARK - MEASURE AGAIN
Chosen conguration may not require use of all hardware or components sup-
plied.
It is recommended to secure hardware into wall studs for overall strength and
stability of closet system.
If choosing a custom designed conguration, modications to the instructions pro-
vided will be necessary.
All congurations provided may be reversed.
STEP 1 - Determining Your Dimensions
1. Locate your desired conguration (Instructions are written for 8 ft.
conguration A).
2. Double hang is created with 2 - 4 ft. shelf length.
3. Long hang is created by cutting a 6 ft. shelf to 21.75 in. wide. (If your
closet is greater or less than 8 ft. wide you will cut your shelf greater
or less that distance.)
STEP 2 - Marking Measurements On Wall
1. Locate the 3 main shelf height locations for your conguration.
2. Measure up from the oor & mark the 84 in. location.
3. Measure up from the oor & mark the 42 in. location.
4. Measure up from the oor & mark the 72in. location.
84 in. - top shelf
42 in. - lower hang shelf
72 in. - long hang shelf
5. Draw a 6 ft. long level line out from wall end at 84 in. location.
6. Draw a 4 ft. long level line out from wall end at 42 in. location.
7. Draw a 22 in. long level line out from wall end at 72 in. location.
8. Locate stud locations at level lines.
1. Place tower sides down with grooves facing up.
2. Insert cam bolts at tower bottom hole locations (Do not over tighten).
3. Insert tower sides into tower bottom.
4. Insert cam nuts into tower bottom shelf with arrow facing bolt hole.
5. Secure by turning cam nuts clockwise to tighten.
6. Repeat for opposite tower side.
STEP 3 - Tower Assembly
1 2
2 3
1 432
5
8
6
7