User Manual
Table Of Contents
- Contents
- Live With Safety
- Parts List
- Service Parts
- Parts Included In Kit
- Tools and Equipment
- Customer Support Center
- Customer Personal Service (CPS)
- Cellular Service
- Basic System Layout
- Selecting Mounting Location For Communications Controller
- Installing Communications Controller
- _
- Removing Communications Controller
- Installing Communications Controller Harness
- Installing Power Harness
- Selecting Mounting Location For Antennas
- Assembling Antennas Using Mounting Bracket
- Installing Antennas Through Machine Roof or Metal Panel
- System Testing
- Vehicle Hours Synchronization
- Problem Diagnosis
- Page Numbers
Installation Instructions
CED,TX13067,2597 –19–19NOV99–2/2
• Where antenna cables go through the roof or steel
panels, install convoluted tubing or grommets to
prevent chaffing or shorting. Make “drip loops” (2) in
cables to prevent water from running down the
cables and into the cab.
• Protect antenna cables by securing to mounting
bracket or other machine brackets with tie bands (5).
• Mount antennas where they are best protected from
damage.
• Antenna height must not exceed overall height
limitations for transporting the machine.
• Route antenna cables with existing cables or
harnesses.
CED,TX13067,2552 –19–27OCT99–1/6
Assembling Antennas Using Mounting Bracket
T128019B –UN–02FEB00
1—VCU10034 Cellular Antenna 2—VCA10005 Antenna 3—Nut 5—Rubber Washer
Cable Mounting Bracket 4—O-ring 6—Cellular Antenna
Continued on next page
DeereTrax (13APR00)
28
Installation Instructions
041300
PN=30
P R O O F P R O O F