User Manual

Installation Instructions
OUO6091,0001433 –19–14AUG01–20/27
PC6969 –UN–19DEC01
A—CCD Bus Connector
B—SCV Panel
31. Connect JDLINK wiring harness CCD Bus connector
(A) to SCV panel (B).
32. Reconnect battery ground.
IMPORTANT: Avoid damage to machine, reinstall
machine enough to be moved but do
not fully reassemble until proper
operation of JDLINK is confirmed.
33. To properly confirm operation of JDLINK, move
machine to an open area so it has clear view of sky
horizon.
34. Shut off engine , set parking brake.
35. Reference JDLINK Machine Messenger’s Technical
Manual to force a contact from the machine to
confirm cell service.
NOTE: Machine must be turned to the RUN position for
five minutes before step 6 of 8 in the online Setup
Confirmation procedure of the machine and
controller.
36. Login to JDLINK website, go to Dealer Menu/Setup
New Device Wizard and follow online procedures,
which will include the input of machine and
controller’s serial number.
37. Confirm test data (i.e. time/date, map location,
machine’s engine hours and electronics system
information).
If data is correct reassemble machine, if data is
incorrect call 1-888-GRNSTAR.
38. Shut off engine, set parking brake and remove key.
Continued on next page
(09JAN02)
12
Installation Instructions
010902
PN=14
P R O O F P R O O F