Operator Manual User Manual

SECTION 3 - MACHINE CONTROLS, INDICATORS AND OPERATION
3121230 – JLG Lift – 3-31
3.10 QUICK-CHANGE PLATFORM MOUNTING
MVL Model Lifts are equipped with quick-change platform mounts
which allow quick removal and installation of currently available
quick-change platforms.
NOTE: MSP Models require the installation of the Quick-Change
mount kit to use Quick-Change Platforms.
Platform Removal (see illustration following)
1. Remove the platform control console from the platform and
lay aside.
2. Remove both upper and lower mount attach pins securing
the platform support rails to the mast mounting channels.
3. Swing and lift the platform out of the mounts and lay aside.
Platform Installation
1. Set platform in upper and lower mounts.
2. Install attach pins in upper and lower mounts.
3. Attach platform control console to platform rail.
ENSURE ALL PINS AND FASTENERS ARE INSTALLED AND SECURE
PRIOR TO OPERATION.
Quick-Change Platform Mounting
1. Upper Platform Mount 3. Lower Platform Mount
2. Upper Mount Attach Pins 4. Lower Mount Pins
1
3
2
4