Instructions / Assembly
Recharging procedure
To recharge either the V-250 or V-250 pump combi, order part no. 4003 “inner cartridge. Shut off all power to the heating unit. Remove the
canister by turning it clockwise. Once open, remove the inner cartridge, clean any debris and replace the cartridge with a new one. Return the
entire unit by twisting on the V-250 cap turning it counter clockwise. Return power to the heating unit and check for any leaks.
Never pipe the outlet of a neutralizer directly to a pipe, outlet should be piped to an open drain or open
wastewater trap.
BOILER
OR
HOT
WATER
HEATER
2
Wall Hung Heater/
V-250 Vertical ph Treatment Cansiter to Drain.
1
LEGEND
1. Flue Pipe
2. Water Trap
3. V-250 Inlet Port
4. V-250 Outlet Port
5. Drain Line
6. Waste Drain
4
5
6
3
D:\6_praca\firmy\YourSpreadsheets\_ icons and history\YS logo.jpg
SGNA
05/15/16----Wall Hung Heater 1
Wall Hung Heater/V-250 Vert. Treat. Can.
JJM BOILER WORKS INC.
Installation
Vseries Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance
3
Figure 1 Piping diagram for wall hung heater/V-250 vertical
pH treatment canister to drain.
BOILER
OR
HOT
WATER
HEATER
2
Wall Hung Heater/
V-250 Vertical ph Treatment Cansiter with Reciever Pump
1
LEGEND
1. Flue Pipe
2. Water Trap
3. V-250 Inlet Port
4. V-250 Outlet Port
5. Reciever Pump
6. Drain Line
7. Waste Drain
8. V-250
4
7
3
5
6
8
D:\6_praca\firmy\YourSpreadsheets\_ icons and history\YS logo.jpg
SGNA
05/15/16----Wall Hung Heater 2
Wall Hung Heater/V-250 Vert. Treat. Can.
JJM BOILER WORKS INC.
MODEL MBH GPH
V-250 250 1.90
MODEL MBH GPH MAX PUMP
HEAD
FLOW
MINIMUM
V-250PC 250 1.90
25 95 GPH
Figure 2 Piping diagram for wall hung heater/V-250 vertical pH treatment canister with receiver pump.