Instructions / Assembly

Installation
Figure 1 Features and dimensions
CBMseries Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance
3
RATINGS & DIMENSIONS (in inches)
Model MBH GPH A B C D E F
CBM-225 225 1.70 0 0 0 0 0 0
Figure 3 CBM-series tube with oor drain, typical
Figure 4 CBM-series tube with condensate pump, typical
A Condensing boiler, hot water heater or furnace
B ondensate neutralizing tube (or multiple tubes piped in parallel)
C Boiler/furnace condensate trap connection
D Boiler/furnace vent
E Vent condensate trap, when used — Install a trap as shown. Connect
the tubing to a separate CBM tube if appliances are common vented.
For individually-vented appliances, the vent condensate drain can be
connected to the appliance condensate drain line.
F Drain or sump
G Condensate pump
H Bottom of boiler/furnace condensate outlet — MUST be ABOVE
condensate pump inlet connection
J Bottom of CBM tube condensate outlet
L Mounting pad or structural platform, when required to elevate boiler
condensate drain as needed
M Mounting clamps
N Mounting clamps must be secured to the mounting surface
P Plastic tubing or PVC pipe — When using PVC pipe, remove the CBM
inlet and outlet hose barb fittings and replace with threaded PVC fit-
tings. Include unions in the piping to allow removal of the CBM tube
for inspection and service. — Secure pipe or tubing in place. — Protect
with a shield if necessary if routed through traffic areas.
R Use hose clamps at all connections when using plastic tubing.
S Condensate drain termination at floor drain (or condensate pump
reservoir inlet) — secure in place with clamps. — Follow instructions
for condensate pump.
T Elevate the CBM tube on a structural base if necessary for the outlet to
be raised.
U Route condensate discharge line from to appropriate drain location.
CBM-225 dimensions
1'-6
7
8
"
2
1
2
"
1
11
16
"
1
4
"
2"
3
1
4
"
13
16
"
1'-3"
11"
D:\6_praca\firmy\YourSpreadsheets\_ icons and history\YS logo.jpg
SGNA
07/23/16----CBM-225 dimensions
CBM-225 Dimensions
JJM BOILER WORKS INC.
1
PVC tubing lled with pH Power Pellets™
2
Clamp-on support brackets
3
Condensate hose barb tting
4
Direct Sch40 Pipe Connections
5
Poly Coupling
6
SS Clamps
CBM-225 dimensions, without end barbs.
2
1
2
"
2"
3
1
4
"
13
16
"
1'-3"
11"
D:\6_praca\firmy\YourSpreadsheets\_ icons and history\YS logo.jpg
SGNA
07/25/16----CBM-225 no barb
CBM-225 Dimensions without barbs
JJM BOILER WORKS INC.
Figure 2
CBM-225 WITH DIRECT
SCH40 COUPLING CONNECTIONS