Instructions / Assembly

NBTseries Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance
Installation
NBT-23
1. Remove clear cover.
2. Remove shipping bubble wrap and safely discard.
3. Remove Date of installation label” and the “red warrant
y
tag”.
4. Re
move the wall mounting “J” hook brackets.
5. Remove the pH Power Pellet® bag.
6. Spread the pellet across the NBT-23 chambers as evenly
as possible.
NBT-24-P
1. Remove the blue cover by slightly prying it upward in the clip
slot of the clear tank.
2. Remove the pump in the same way
.
3. F
ill chambers 1-4 with pH power Pellets® slightly below th
eir
4. DO NOT ALLOW PELLETS INTO CHAMBER #5.
5. Fill chambers 50% with tap fresh water.
6. Return the pump and blue cover back into position makin
g
su
re they snap in place.
Wall hung NBT-23
1. Secure the “J” brackets through the holes provided 10” apart to the wall using the proper screws or bolts to handle eight pounds
of weight. If mounting to the jacket of boiler, hot water heater, or furnace caution should be taken not to damage wiring or any com-
ponents of these units with your mounting anchors. Place the NBT-23 tank i
nto theJ” hooks; it is now ready to be piped. We highly
2.
open house waste drain or condensate pump system. Follow the piping diagram in this manual which best applies your installation.
3. Do not terminate the tank outlet piping outside where temperatures will reach freezing or below (32F or 0C).
5.
6.
on the tank).
7. Pipe hangers or brackets should be used to support all piping.
8. Place the “Installation Label” on the side on the NBT-23 tank so as to be visible to the end user. Indicate on which date the uni
t
w
as installed. Also place the stringed “Red Warranty” tag in close proximately to the outlet port and advise the owner of the need to
replace the pellets at least once a year at minimum or if the pH falls below 5.0 pH which ever occurs rst. Also, advise the ow
ner of
the need to ll out the warranty card online at www.jjmboilerworks.com or via mail.
Floor mounting the NBT-23 or NBT-24-P:
1.
2.
3. Follow steps 1-13 for wall mounting.
4.
Operational Flow Model NBT-23:
Magnesium Hydroxide Pellet (pH Power Pellets®). A chemical reaction now takes place in which ions from the acid and pellets are
exchanged raising the ph level of the acid in the range of 5.0 to 9.0 pH. In this ranged the condensate can be safely be put to a
waste drain via the NBT-23 outlet port and piping.
Operational Flow Model NBT-24-P:
3
4. Remove pH power pellets® from the plastic shipping bag and place the pellets evenly in the chambers.