Instructions / Assembly

Maintenance Procedures
NBTseries Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance
413-527-1893
690 Island Way Unit 206, Clearwater, FL 33767
413-427-3373
jjmboilerworks.com
Revised - June, 2019
Getting the most out of your JJM
®
Neutralizer
-
When the pH falls below 5.0 at the outlet port of any neutralizer the active ingredient must be replaced.
using a passive Inline Tube, Tank, or Canister the range of pH modication will fall in bewteen 5.5 and 9.5 pH.
Media replacement schedule
In the case of an inline tube products try lightly tapping the outer sides of the tube with a rubber mallet several times and then check
When your neutralizer is a tank product with loose pellets
you can simply use a wooded dowel to stir the pellets and again use
If your neutralizer pellets are incased in a porous pellet bag there are three methods to agitating the pellets:
1. Remove the pellet bag or bags from the tank and using your hands move the pellets around inside the bags.
3. Using a fresh water hose slowly pour fresh water over both sides of the pellet bag and also use method one.
If the pH level is has not risen back into the safe range of 5.0 to 9.5 pH the pellets must be replaced.
If you have our V Series models: V-125, V-250, V-252, V-253 vertical canisters try the following method:
to agitate the pellets.
shake the cartridge to agitate the pellets. Also clean out any sediment which may be held within the outer canister.
DURING ALL OF THE ABOVE PROCEDURES THE FOLLOWING SAFETY ITEMS MUST BE USED:
1. WEAR SAFETY GLASSES
2. WEAR RUBBER OR LATEX PROTECTIVE GLOVES
3. SHUT OFF ALL ELECTRICAL POWER TO THE HEATING UNIT OR UNITS BEFORE SERVICING YOUR
NEUTRALIZERS.
Non-Hazardous and can be disposed of in your normal refuge.
MSDS sheets can be found online at www.jjmboilerworks.com.
Any questions can be directed to JJM Boiler Works, Inc. at
413-527-1893 or at www.jjmboilerworks.com
George Carney, President, JJM Boiler Works, Inc.