Use and Care Manual
• Assembly of tanks
Lift the front end of the evaporator slightly,
and then put the tank into the evaporator.
Put the rear end of the bucket into the rear
sealing ring of the evaporator, and then
continue to push the tank forward until the
front end of the material barrel is locked
into the limit of the tank seat.
• Assembly of material outlet parts
a line,then pass the cross pin through,and then tighten the cross-pin nut on the cross pin.
A.Put the valve stem under the outlet of
the tank.
B.Put the discharge spring down from the
top of the tank outlet and place it on the
valve stem.
C.Insert the front end of the handle into
the stem limit slot.
D.Press the card groove on the back of
the discharge spring along the material
outlet limit.
E.Adjust the handle rotation hole, the
discharge spring upper cover fixing hole
and the material outlet cross pin hole to
Note: the valve stem sealing ring should be smeared with Vaseline before the outlet can be installed.
• Assembly of the tank cover
Insert the slot at the front end of the tank cover into the upper position at the front end of the
bucket, and then insert the plug at the back end of the tank cover into the bucket socket.
Tank lid card slot
Tank clamping position
Tank cover
Tank socket
Tank cover plug
Tank seat limit
Handle
Handle pin
Valve stem
Outlet spring
18
Back end of tank
Evaporator front
Tank