Installation Guide
JELD-WEN DesignGlide Barn Door Hardware System Installation
(JII-90003)
8
STEP 4: TRACK INSTALLATION
Install soft close to track.
1. Align the soft closes ⑰ on the track as shown in Figure 16, with
catches cocked towards the center of the track.
2. Fasten the soft close to the track using the supplied M4 x 35mm
socket cap screws ⑱, M6 washers ⑲ and M4 locking nuts ⑳.
3. Fasten with supplied 3mm Allen wrench ⑨.
Orient both soft close mechanisms with
movable catches toward center of track
Figure 16. Soft Close Orientation
Fastening track to backer board.
1. Secure the rst and last holes in the track ① using a 55mm lag bolt
③, M8 washer ⑤, passive end stop ④ and standoff ⑥.
2. Secure the rest of the holes with a 55mm lag bolt ③, M8 washer ⑤
and standoff ⑥.
Figure 17. Track Assembly
STEP 5: FLOOR GUIDE INSTALLATION
1. Reference Figure 14 on Page 7, to locate the installation location of
the oor guide, relative to open/closed positions of the system.
2. Using a pencil, mark 2" away from the wall and 1.5" in from the
interior edge of the opening.
Note: If there is a baseboard, take its thickness into consideration.
3. Predrill with a 3/32" bit, 1" deep. If installing into a concrete oor,
predrill with a 1/4" bit, 1 3/8" deep.
4. Assemble oor guide as shown in Figure 18. If installing into
concrete, install oor ⑯ anchor into predrilled hole.
5. Hand tighten the oor guide in place, ensuring the rubber base has
the ability to rotate.
Figure 18. Floor Guide Assembly
⑱
⑰
⑳
⑲
⑨
③
⑤
⑥
③
④
⑤
⑥
①
⑯
⑮
⑮
2"
1 1/2"