Owner's manual
7
INSTALL DOOR - CONTINUED
6
INSTALL HARDWARE
1. Identify handing and operation of door unit. Locate matching
conīguration on schematic and circle it. Panels are numbered
according to installed position, left to right, as viewed from
the exterior/clad surface.
2 Left 4 Left
4 Right
2 Left 2 Right
3 Left 1 Right
1 Left 3 Right
2 Right
3 Left
2 Left 1 Right
1 Left 2 Right
3 Right
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Exterior
Exterior
Exterior
Exterior
Exterior
Order of Installation
Order of Installation Order of Installation
Order of Installation
Order of InstallationOrder of Installation
Order of Installation Order of Installation
Order of Installation
Order of Installation
Order of Installation
Order of Installation
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
LEGEND
Pivot Flush bolt Intermediate Carrier
Handle Handle set Directional/Handed Carrier
1 2
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2
1 2 3
1 2 3
1 2 3
1 2 3
ASSEMBLY AND INSTALLATION INSTRUCTIONS
for W-4500 Folding Door Systems (JII041)