Instructions / Assembly
INSTALLATION INSTRUCTIONS 
for Vinyl Patio Doors with Integral Nailing Fin (JII006)
8
Please visit jeld-wen.com/resources for warranty and care and maintenance information.
Thank you for choosing
© 2007, JELD-WEN, inc. | JELD-WEN and Reliability for Real Life are trademarks or registered trademarks of JELD-WEN, inc., Oregon, USA.
FINISH INSTALLATION
1.Drivetwo#10x3"
screws through 
the open screw 
holes in the strike 
plate (included in 
hardware pack). 
2. Remove the pre-
installed screws 
from the strike 
plate and replace 
them with the 
remaining#10x3"
screws from the 
hardware pack. 
This will secure the 
patio door to the 
structure.
08/07
7
COMPLETE INSTALLATION - CONTINUED
AFTER INSTALLATION
1. Install exterior wall surface within seven days of patio door 
installation.
2.Sealanygapsoropeningsatendofhorizontalmulljointswith
sealant.
3.Maintaingapof1/4"-3/8"betweendoorframeandnalexterior
wall surface (siding, stucco, etc.).
4.Sealthisgaponthesideswithbackerrodandsealant.Forstep-down
landings, also seal under the patio door sill. Do not apply sealant on 
top of the drip cap.
5.Ontheinterior,insulatethevoidbetweentheroughopeningand
the door frame with backer rod and sealant or low expansion foam.
6. Protect recently installed units from damage from plaster, paint, etc. 
by covering the unit with plastic.
Premium Patio Door
Replacement 
screw
Pre-installed 
screw
Pre-installed 
screw
Builders Patio Door
Pre-installed 
screw
Replacement 
screw
Pre-installed 
screw








