Installation Guide

INSTALLATION INSTRUCTIONS
for Vinyl Projecting Windows with Integral Nailing Fin (JII023)
4
5.Liftuptheback
of the wicking
and staple into
place on the
sill.
6. Pull release
tape and set
JELD-WEN
drain mat into
place.
7. Fold the drain
mat down onto
the sheathing.
Staple drain
mat to the wall
and seal the
corner edges as
shown.
8. Smooth out
any bubbles or
creases with a
J-roller.
9.Levelsillas
needed with
non water-
degradable
shims.
1. Measure 2"
from the
outside edge
of the sill and
draw a line all
along the sill.
This is where
the back of
the JELD-WEN
drain mat will
sit.
2. Cut a piece of
drain mat the
length of the
sill plus 6".
3. Trim off 3"
of foam on
each end of
the JELD-WEN
drain mat. Be
sure not to cut
into the drain
mat material.
4.Placedrain
mat on rough
opening sill,
wrapping the
drain mat up
3" on each
jamb as shown.
PREPARE SILL FOR BAY/BOW WINDOW
4
Width of
rough opening
6"
2"
Release
tape
Foam
Wicking
3"
3"
Wicking
Release
tape
Seal
corners