User`s guide

5
To Test Installed Cable (Office jack to patch
panel)
1) Remove remote unit from main unit by
sliding remote towards top of the main unit.
2) Attach one end of supplied one foot jumper
cable to remote and other end to wall jack.
3) Attach one end of the second supplied one-
foot jumper to main unit and the other end to
the patch panel jack.
4) The tester will power on immediately,
indicating a test in progress by quickly
winking the pair lights on both the main and
remote; it will be immediately followed by a
combination of pair lights on — this shows
the test results. See Main Unit Results and
Remote Unit Results sections on page 7.
5) Disconnect after test. The test repeats
automatically every 2.3 seconds if the
cable has only open and passing pairs and
repeats every 4 seconds if there are failures.
Application Hints: The jumper cables must be
short compared to the cable run for accurate
split pair indication, no more than 10% of the
total run length.