User's Manual

Remove all contents from packaging and inspect to ensure no damage was incurred during shipping. Your 2x2 package
should include the following:
operating instructions
(
before you begin
)
description part # qty
OPERATOR’S MANUAL LIT102B 1
SHUNT INSTRUCTIONS 06958 1
WARRANTY CARD 0070342 1
2.5 MM HEX KEY 0151255 1
4MM HEX KEY 70587 1
5MM HEX KEY 70588 1
6MM HEX KEY 058112 1
8MM COMBINATION WRENCH 0151219 1
KNOB AND SPOKE HANDLE 07018 3
SAFETY STRAP 06798 1
KNOCK-OUT WEDGE 07517 1
SAFETY AND MAINTENANCE CD 06814 1
#2MT ARBOR ASSEMBLY 07504 1
COOLANT BOTTLE ASSEMBLY 0151511 1
3/16" PILOT PIN 1" D.O.C. 16001 1
3/16" PILOT PIN 2" D.O.C. 16002 1
1/4" PILOT PIN 1" D.O.C. 16003 1
1/4" PILOT PIN 2" D.O.C. 16004 1
getting started
CAUTION!
always disconnect 2x2 from power source before making adjustments.
Assemble three spoke handles (item #404) to feed hub. NOTE: Feed hub assembly is mounted on right side of machine
frame if necessary, it can be reversed for lefthand operation by simply removing the fastener (item #402) and hub (item
#401) from frame. Remove hub pinion shaft from right side of frame and insert it into left side of frame. Replace hub
and fastener into frame and tighten securely.
Install the arbor into the drill motor by inserting the arbor body into the spindle. By turning the arbor while inserting, the
arbor tang will properly line up in the spindle. The stop rod (item #911) should be between the inducer pin (item #904.3)
and the hose connection (item #904.2) when properly installed. Turn the arbor until it bottoms out in the spindle and
then tap lightly with a plastic hammer to secure.
To install coolant bottle, use bracket (item #611) to slide the coolant bottle onto the two retaining screws (item #614),
located on the right side of drill. Install the free end of hose onto hose connection (item #904.2) on the arbor.
7
what you should know before you drill
1. Type of material to be drilled, Brinnell or Rockwell hardness, material thickness and position should all be determined
to ensure proper selection of Slugger cutting tools, RPM, coolant and drilling time.
2. Remove any excessive mill scale or rust from surface to be drilled.
3. Material that has been flame cut may have become heat-treated and therefore difficult to drill. Avoid drilling near
such areas whenever possible.
4. Drilling with the 2x2 in horizontal positions requires a special lubrication for Slugger cutters.
Consult Jancy Engineering for details.