User Guide

Lay the bottom rail on the floor between the two vertical
posts. Locate the front surface of the bottom rail 5/8"
behind the front surface of the vertical posts as shown in
illustration 3. Fasten the bottom rail to the floor using the
screws provided.
With isopropyl alcohol, clean an area 2" long (6 places)
on the rail and bottom edge of the skirt. These locations
should be at the center line and 12" from each end of
both parts; (see illustration 4.) Remove liner from
adhesive backing and apply the strips of Velcro
®
hook
tape to the bottom rail, 12" from each end and in the
center, as illustrated. Apply strips of Velcro
®
loop tape to
the bottom of the skirt, 12" from each end and in the
center, so that they will attach to the bottom rail when the
skirt is installed.
Lift the top of the skirt up under the rim of the bath, center
the skirt in the opening, then swing bottom of skirt toward
the rail and lower skirt onto rail. The Velcro
®
on the skirt
and the bottom rail should mesh.
©1991 B243000 C 11/94
Printed on Recycled Paper
Printed in the U.S.A.
SCREW
SCREW
BRACKET
BRACKET
WOOD BLOCK
AT CORNER
OF BATH RIM
POST
(Right Hand
side shown)
SPEED
NUT
2
FIXED SIDE
PANEL
5/8"
BOTTOM
RAIL
BOTTOM
RAIL
SCREWS
(PROVIDED)
FIXED SIDE
PANEL
3
REMOVABLE SKIRT
BOTTOM RAIL
VELCRO
®
LOOP
TAPE
CENTER OF RAIL
12"
HOOK TAPE
4
LIFT TOP OF
SKIRT UP
UNDERNEATH
RIM OF BATH
INTERLOCKING
VELCRO
®
TAPES
SHELL CLIP
WOODEN
BLOCK
5