Installation Guide
Shower Base Installation And Operation  www.jacuzzi.com  Page 3
 English 
  Remove the shower base from the carton. Do not destroy the shipping carton until after satisfactory inspection of the  
  product. Should initial inspection reveal any damage or defect in the shower nish, do not install the shower base. Jacuzzi 
  Luxury Bath’s responsibility for shipping damage ceases upon delivery of the product in good order to the carrier. Refer any 
  claims of damage to the carrier. Any damage or defect claimed after installation is excluded from the warranty. Jacuzzi 
  is not responsible for any defect or damage that could have been discovered, repaired, or avoided by following this   
  inspection and testing procedure.
  Plan the installation in relation to the nished wall surfaces. Take into account the dimensions of both the shower base and 
  the door enclosure. Install the optional trim parts after all other installation is completed. 
  Provide a minimum 5" x 5” opening in the suboor. The opening should be located on the center lines ( ) of the base 
  drain hole. Refer to technical product specications which can be found at www.jacuzzi.com/baths/support/specs-and- 
  manuals/. The opening is to accommodate a 2” waste pipe. The waste pipe should be 1/4" to 1/2” above the surface 
  of the suboor, see Figure 1. If the suboor is level, no other preparation is necessary. Proceed to install the base. If the 
  suboor is not level, level the shower base by spreading a oor-leveling compound, mortar, plaster, or minimal expansion 
  structural foam with a density of 5 pounds per cubic foot (lb/ft
³
) minimum, see Figure 2 (page 4).
 NOTE: The compound must make contact with the entire bottom surface of the base feet. The base is not to be supported 
  by the base ange. Both sides of a joint or splice of sub-oor should be level to each other.
1
2
3
Figure 1
Neo-Angle Rough-In 
(See technical product 
specifications on 
www.jacuzzi.com/baths 
for proper size of alcove
and drain location.)
Square or Rectangular 
Rough-In (See technical 
product specifications on 
www.jacuzzi.com/baths 
for proper size of alcove
and drain location.)
Blocking is used between studs.
Height to be even with base flange.
Blocking is used between studs.“Height to be even 
with base flange.”
*5” x 5” Floor Opening
Refer to your model for 
correct location. 
*5” x 5” Floor Opening
Refer to your model for correct 
location. (Shown with Left-Hand 
Drain Location).
*Note: Be sure floor opening matches the bath fixture drain location.
*Note: Be sure floor opening matches the bath fixture drain location.
Drain stub-out is located 
1/4” to 1/2” above the sub-floor.
Drain stub-out is located 
1/4” to 1/2” above the sub-floor.
*Alternate floor opening for center drains
90°
90°
A + 1/4”
Min.
A + 1/4”
Min.
B + 1/4”
Min.
B + 1/4”
Min.
90°
90°
 Shower Base Installation Instructions