Installation Guide

Page 6  www.jacuzzi.com  Bathtub Wall Kit Installation
Fasten screws to
top and front nailing
flanges
Nailing
Flange
Stud
Fur Strip
(if necessary)
Finishing Material
(Drywall or 
Cement Board)
Screw
Shim
(if necessary)
Silicone
  Carefully position the assembled wall kit into the alcove     
 andpressrmlyagainstthebathtub(Figure7).
  WARNING: Two or more adults are required to lift the     
  assembled wall kit and position it into place.
  To fasten the wall kit to wood framing, 
 pre-drilltopandfrontnailinganges
  with a 1/8” (5mm) carbide bit, then 
  fasten with #8 x 1-1/2” (38mm) self- 
  tapping sheet metal screws (Figure 
  8). For fastening to concrete/block 
  walls, use 1” (25mm) concrete   
  nails with nailing tool or impact. It may 
 benecessarytoshimthenailingange
  to close up any gaps between the wood 
 studsandtheange(Figure8).
 NOTE:Pre-drillingthenailingangesis
  recommended. Fastening the screws   
 withoutrstpre-drillingtheholescan 
  cause cracking of the wall kit.     
  Apply silicone over each fastener   
  to ensure water tightness.
  Apply a continuous bead of silicone sealant 
  around the entire seam between the   
  bath tub and wall kit, as well as the the seams 
  between the wall panels. Allow sealant to cure 
  per manufacturer’s instructions.
7
8
Primo
®
 Bathtub Wall Kit Installation Instructions (Continued)
Figure 7
9
Figure 8










