Installation Guide

Page 4 www.jacuzzi.com Bathtub Wall Kit Installation
Apply
silicone
here
Apply
silicone
here
Center
wall
panel
Dependingonthelocationoftheplumbingxture,
position either the right side or left side wall panel
intothealcove.Markthepanelforplumbingxture
cutouts (Figure 2).
Refertoplumbingxtureinstallationinstructions
for hole dimensions and placement. Carefully drill
out the holes using the proper sized hole saw.
Remove the side wall panel from the alcove. Pre-
assemble the wall kit away from the alcove.
Apply a bead of silicone sealant along the edges of
the center wall panel (Figure 3).
Primo
®
Bathtub Wall Kit Installation Instructions
1
2
3
Mark locations
for plumbing
xtures
Figure 2
Figure 3
4