Installation Guide
Page 6 www.jacuzzi.com Installation and Operation
Collection Comfort
English
DANGER: Risk of electric shock. Connect only to a circuit protected by a GFCI (Figure 2A-2B).
CAUTION: Electrical outlet must be mounted
4˝ (101mm) above the oor line and 12" max
(305mm) inside from the edge of the bathtub
(Figure 2A-2B), or in accordance with local building
and electrical codes.
Risk of component overheat. Do not use electric
extension cord to power this unit. Operating the
pump without enough water in the bathtub can
cause permanent damage to the pump/motor.
If the GFCI unit indicates a malfunction, per
manufacturer’s instructions, turn OFF power and
do not attempt to use the bathtub until the source of
the problem has been identied and corrected.
When using electrical products, basic precautions
should always be followed:
• Always follow local building and electrical
codes. Grounding is required. The unit should be installed and grounded by a qualied electrician.
• A dedicated, 120VAC, 15 Amp GFCI-protected circuit is required for the pump/motor or blower. If the bathtub
was purchased with a whirlpool heater installed, a separate 120VAC, 15 Amp GFCI-protected circuit is
required. Bonding lugs are provided on the motor and heater to satisfy local electrical codes.
Framing And Support (Continued)
Fig. 1
(Illustrations above shown with framing exposed for clarity.)
Access Locations
Access Location
Examples
Suboor
Fig. 2A
Whirlpool w/optional heater
Optional Heater
12.00"
(305mm)
4.00"
(101mm)
Electrical Connections
• Per UPC code, access must be provided to the pump/
motor or blower for your specic model (Figure 1). It is
the responsibility of the installer, building contractor, or
owner to provide access for service. Jacuzzi Luxury
Bath is not responsible for any costs relating to
obtaining access for repair. The owner shall bear
such costs and, if appropriate, must seek recovery
from the installer. Primary and secondary service
access locations are shown in the rough-in diagrams
contained in the Technical Specications Manual.
• Provide adequate ventilation for cooling and supply
sufcient air for the pump or blower. Do not
insulate around the equipment.
1. Prepare the suboor for the drain and ensure that the area is level. The drain/overow of the bathtub extends
below the bottom of the bathtub. Identify the drawing in the Technical Specications Manual that corresponds with
your bathtub.
2. The Tru-Level™ base is a standard feature on most bathtubs. If the suboor is level and a continuous surface, no
other preparation is necessary. Proceed to the “Installation Procedures” section.
3. If the suboor is not level, you must level the entire surface prior to installing the bathtub.
4. Ensure that the oor is level and can support a load as specied in the technical specications.
5. The bathtub must remain level in order for it to drain properly and must make contact with the leveling material.