Installation Guide
Table Of Contents
English
Freestanding Baths
Installation Instructions www.jacuzzi.com Page 5
1
Install the metal drain/waste
tting (supplied with the tub)
into the drain hole as illustrated
(Fig 2). Ensure that the drain
opening on the waste tting is
situated in the integral overow
channel (Fig. 2).
2
Use clear silicone to adhere the
bottom gasket to the underside
of the integral overow channel.
3
Secure the waste tting with
the supplied waste tting nut.
Apply thread sealant to the
threads prior to inserting the
nut. Overtightening the nut
may cause shell damage.
Ensure the drain opening on the waste tting is not exposed after tightening of the nut.
4
Install a PVC thread adaptor (not supplied) to the metal waste tting. This is to provide a PVC to PVC drain adapter
connection protruding from the oor. Water test tting for leaks before installation. NOTE: Use PVC Cement per ASTM D2564
on all PVC joints.
Installation Instructions for Tubs with Integral Overow
TOE-TAP DRAIN COVER
(SUPPLIED)
INTEGRAL OVERFLOW
CHANNEL
DRAIN OPENING
WASTE FITTING
TOP GASKET (SUPPLIED)
WASTE FITTING NUT
(SUPPLIED)
WASTE FITTING
(SUPPLIED)
WASTE FITTING
BOTTOM GASKET
(SUPPLIED)
SILICONE ALL AROUND
1-1/2” FPT TO SLIP
ADAPTER (NOT
SUPPLIED)
INTEGRAL OVERFLOW
CHANNEL
DRAIN
DETAIL
SEE DRAIN DETAIL
Fig 1.
Fig. 2
Installation Instructions for 1-Piece Tub
1
Set the tub in its place and position precisely with respect to
the drain-overow location. Verify where the indentation for
the drain is in relation to the drain-overow. Use a marker to
outline the perimeter of the entire tub directly on the oor
(Fig. 3).
2
Mark a trough for the overow drain location on the oor.
The drain/overow extends below the bottom of the bath.
The drain/overow requires a cutout of the oor
for providing space to accommodate the extension. Do not
exceed the dimensions of the tub perimeter. When the
above locations have been marked on the oor, remove the
tub, set it aside and continue with the installation process.
3
Prepare the drain/overow trough according to the
dimensions shown in the Technical Specications section.
The depth of the trough depends on the vertical extension
of the drain elbow at the bottom of the plumbing below
the oor level. Install the drain/overow according to the
manufacturer’s instructions. Refer also to the Technical
Specications section.
Watertight installation of the drain is the installer’s
responsibility. Drain leakage is excluded from the Jacuzzi
Luxury Bath warranty of this product.
4
Before the tub may be secured to the oor, the following
steps must be completed: Place the tub on the oor in
relation to the drain/overow. Place the tub on the oor and
line up with the markings previously made on the oor.
Floor-mounted or wall-mounted faucetry can be used exterior
to the bath, this can be installed after the bath is installed into
the oor.
Clean up debris left over from the construction steps taken thus far. Also, remove the perimeter outline of the template on
5
the oor. Use silicone to attach tub to the sub oor. Make sure the tub is properly oriented according to the drain/overow
end.
A bead of silicone sealant should be applied around the bottom of the tub. Carefully place the tub on the oor in the correct
position and press to the oor. Place weights around the perimeter and allow the adhesive to cure before proceeding.
Silicone
Bottom
View
Side
View
Fig. 2
Units equipped
with Whisper+
Technology
TM
or Heated Soak
only. Refer to
supplied template
for electrical
connection location.
Fig. 3