Installation Guide
Salon™ Spa Bath
Page 14  www.jacuzzi.com  Installation and Operation
English
8
  Install the unit, inserting the equipment- end rst, 
lowering the bathtub into the opening as shown in 
the illustration (Figure 10). 
  DO NOT use plumbing xtures or lines to lower the 
unit. Allow the bathtub to rest on the supports.
Drop-in Installation (con’t)
Level Suboor
Level Suboor
Scrap Lumber
Figure 12
Figure 11
Figure 10
2˝ 
(50mm) Max 
Thickness
Tile or 
Finished 
Surface
Member Support
Substrate
9
  Inspect all ttings, plumbing, and control lines 
after inserting to insure the components are not 
damaged, disconnected, or contacting the nish 
surface substrate or support members.
10
  Connect ex water supply lines to faucet and plug 
power cords into GFCI outlet.
11
  Remove scrap lumber and lower the bathtub fully 
into the opening (Figures 11 and 12).
12
  Align the bathtub and connect the drain.
13
  Turn on the power supply to the dedicated GFCI 
protected circuits and check system operation.
14
  Caulk around the perimeter of bathtub to seal 
the space between the rim and the nished deck 
(Figure 8 on previous page).
Uneven 
Suboor
Floating 
Floor 
Compound










