Manual

10
I
Step 1 - Install both spindles. Use (2) 1” x 9” Hex Bolts and (2) 1” Centerlock Hex Nuts to attach the spindles
to the cart. Next slip the 6” Rubber O-ring onto the spindle.
Step 2 - Use an overhead hoist to pick up the grain cart. Use a hoist and chains that are rated for the specic
weights. e weights are located in the grain cart manual. When raising the grain cart keep the I-beam axle
level with the ground.
When liing the grain cart keep the I-beam axle level with the ground.
Step 3 - Pick the Tracks up with a fork li. Put both of the forks in-between two bogie wheels. It is recom-
mended to use a forkli with the side shi option available. Use a fork li that is rated for at least 6,000 lbs.
NOTE: e airbag on
the tracks always goes
towards the front of
the cart.