Manual
13
Install Pop Rivets on Roll Tube
Install the Roll Tarp Stops
Line the roll tube spool up with the spring return cable. Drill a 1/4” hole through the rst stiening
patch. Fasten the canvas tarp using a pop rivet. Go to the rear of the cart, pull the canvas tarp tight, and
repeat the process. en install pop rivets at the remaining stiening patches. Once nished slip the
Spring Return cable loop over the spool.
Next place the 1” tube under the top bolt of the corner bracket. Drill a 1/4” hole approximatley 18” to 24” in
from the corner of the cart. en redrill the hole with a 7/16” bit. Place a 3/8” x 2”bolt through the 1” tube and
grain cart sidewall. Fasten with a 3/8” serrated ange nut. Now repeat this process at the front and middle of
the cart.
18”-24”
Tools Needed:
1/4” Drill Bit
7/16” Drill Bit
9/16” Socket & Wrench
Tools Needed:
1/4” Drill Bit
Hammer
1” Steel Tube