Instructions / Assembly
6
7) Set the next cabinet tight to the rst 
cabinet and use clamps to hold in place 
while you level it and make sure that 
the front edges are ush. Attach the two 
cabinets together using 1 1/8" particle 
board screws. Attach the cabinet to the 
wall with 2 1/2" screws into the studs. 
Continue with the same process for all 
upper cabinets. 
8) Always start with the corner base cabinet 
making sure it is level. Install 2 1/2" screws 
through the top fastening strip into the 
studs that were previously marked.
10) With the base cabinets in place, insert 
the toe-kick clips into the leg. Set the 
toe-kick in place and push down on the 
clip to secure the toe-kick.
9) When installing the base cabinets, start 
by unfolding the legs and adjust them 
to 4 1/2" from the cabinet base. Place the 
cabinet on its legs and put into place. 
Further adjustment may be needed to 
make the top of the cabinet level with 
your 34 1/2" level line.
1
2
3
Push & click
Push down 
on clip









