Installation Guide

Table Of Contents
Accessory Part number
Pipe mount kit for pipe diameters between 1-5/16”
to 2 ¼”
CFG-0217-504
Cable armor (for field retrofit installation instructions, Using the Itron Cable Armor on page 43)
5 foot cable thin-insulation (with protective cover
and cable armor)
CFG-0151-006SS
5 foot cable thick-insulation (with protective cover
and cable armor)
CFG-0151-010SS
5 foot cable armor for field retrofit FAB-1302-001
Direct mount screw pack SCR-0010-005
Direct mount screw pack, bulk: 80 per bag SCR-0010-004
Direct mount screw pack, bulk: 122 per bag SCR-0010-001
Installing the Module Cable Strain Relief
After you complete the 500W ERT module to register connections, install a cable tie to the
meter cable just below the exposed colored lead wires on the cable insulation. The cable tie
provides a cable strain relief to reduce the risk of destructive tension on the lead wires.
These materials are required to install the cable strain relief:
Remote mount kit
CFG-1300-003, dual cable ports for register connection and telemetry device connection
Side cutter pliers
Gel connector crimping tool
Cable tie gun
Torx T-15 screwdriver
Securing the Cable Strain Relief
1. Wrap the cable tie around the meter register or secondary connection cable.
500W ERT Module Remote Installation Guide 4 Installing the Remote 500W ERT Module
30 June 2021 815-0005-00 REV 008 Itron, Inc. Page 23 of 45