User Manual
Installation Guide: PETNET System Components
6.0 Required Equipment and Materials for Electronic Installation
Hardware
• PETRC Unit
• PET Repeater unit and required antenna and
coaxial cable
• Laptop Computer
• 40’ Data Cable (Part Number 520-0329-001)
[See Figure 1]
• 20’ DB9 serial cables
• DC/AC Inverter (150 watt minimum)
• 50’ AC Electrical Extension Cord
• Magnetic roof top antenna
• Drill (battery operated)
• 12” Drill Bits (regular and able to penetrate
walls)
• Wrench set up-to 9/16
• Socket set up-to 9/16
• Screwdrivers (Phillips and Slotted)
• Crimp tool
• PET Module
Software
• Microsoft Excel
• ProComm Plus
• MicroSurvey
Data
• Installed PET Population Database including an
PET ID list that has been checked for
corresponding apartment number. (Critical for
proper installation)
• Maps/diagrams of area
• PETRC configuration/parameters
Supplies
Lag bolts
Antenna Brackets
Grounding rod
60 feet of #10 solid core cable
Cable clamps
Clean tools
Alcohol