User Manual

Installation Guide: PETNET System Components
The “Connection:” field on the MicroSurvey screen should be set to the “Direct
Connection” default.
Step 2:
Click the “Terminal” button on the MicroSurvey application screen.
In the “Terminal Screen” that appears,
Click the “Debug ON” button.
NOTE:
The “Terminal Screen” screen will begin to scroll information.
NOTE:
NOTE: If Information does not scroll on the screen the unit is not operating
properly and must be returned to Itron, Inc.
Allow the system to operate independently for approximately 10 minutes.
Click the “Receive” button.
Click the “Debug OFF” button.
Click the “Close” button.
Step 3:
Click the “ERT Database” tab on the MicroSurvey application screen.
Click the “Dial” button.
NOTE:
The “Status Window” screen will scroll information and a “Download” screen will be
displayed.
The first time that the “Dial” button is clicked, an error condition may occur. To
proceed, wait 10 seconds and click the “Dial” button again.
When the “Download” screen disappears, the fields in the “ERT Database” tab table will be
filled.
Importing Site Data into the MicroSurvey Application:
Step 1:
Click the “Import” button on the MicroSurvey screen.
In the browser screen that appears, choose “All Files” in the “Files of Type:” field.