User Manual
Installation Guide: PETNET System Components
• The “Connection:” field on the MicroSurvey screen should be set to the “Direct
Connection” default.
Step 2:
• Click the “Terminal” button on the MicroSurvey application screen.
• In the “Terminal Screen” that appears,
• Click the “Debug ON” button.
NOTE:
• The “Terminal Screen” screen will begin to scroll information.
NOTE:
NOTE: If Information does not scroll on the screen the unit is not operating
properly and must be returned to Itron, Inc.
• Allow the system to operate independently for approximately 10 minutes.
• Click the “Receive” button.
• Click the “Debug OFF” button.
• Click the “Close” button.
Step 3:
• Click the “ERT Database” tab on the MicroSurvey application screen.
• Click the “Dial” button.
NOTE:
• The “Status Window” screen will scroll information and a “Download” screen will be
displayed.
• The first time that the “Dial” button is clicked, an error condition may occur. To
proceed, wait 10 seconds and click the “Dial” button again.
• When the “Download” screen disappears, the fields in the “ERT Database” tab table will be
filled.
Importing Site Data into the MicroSurvey Application:
Step 1:
• Click the “Import” button on the MicroSurvey screen.
• In the browser screen that appears, choose “All Files” in the “Files of Type:” field.